An article in Jakarta’s newspaper 02-November-2009, stating the Government railways are moving forward with new rail technology by installing Trakblaze LTS4 train scales.
An article in Jakarta’s newspaper 02-November-2009, stating the Government railways are moving forward with new rail technology by installing Trakblaze LTS4 train scales.
At a glance Proper site preparation, including soil stability, drainage, and clear vehicle access, is vital for long-term weighbridge accuracy.
At a glance Axle scales are smaller, cost-effective, and capture axle-by-axle data, ideal for smaller fleets, temporary sites, and axle
Feel free to contact us. We are always ready to help you.
Head Office:
Trakblaze Pty Ltd
5 Mareno Road,Tullamarine,Victoria 3043, Australia
Phone: +61 3 93189277
Email: [email protected]
Feel free to contact us. We are always ready to help you.
Head Office:
Trakblaze Pty Ltd
5 Mareno Road,Tullamarine,Victoria 3043, Australia
Phone: +61 3 93189277
Email: [email protected]
Fill out the form below, and we will be in touch shortly.
Fill out the form below, and we will be in touch shortly.